How a shutdown at Chooz A was overcome ⁉️

How a shutdown at Chooz A was overcome ⁉️



The decommissioning of France’s first pressurized water reactor, Chooz A, marks a historic turning point in the nuclear industry. However, as the newspaper L'Ardennais recently reported, the teams faced a massive challenge: recurring contamination incidents temporarily halted the dismantling of the reactor pressure vessel.


This is exactly where our expertise came into play. 🤝


Working in close collaboration with the Westinghouse Electric Company on-site, we developed a tailor-made solution to continue the decommissioning process safely and efficiently. By lining the reactor cavity with specialized, flexible membranes, we were able to:


▪️ Effectively seal contamination pathways
▪️ Maximize safety
▪️ Guarantee process stability


This project proves that a strong dialogue between engineers and the teams working on the front line every day elevates decommissioning to the next level of safety.

A huge thank you to the teams for their trust and for the execution.



















FOLLOW OR CONTACT US

25 juin 2026
Our foldable tunnels are having a real identity crisis... 🤪💨
23 juin 2026
Extreme heat on the construction site? ☀️ Protect your team!
16 juin 2026
📐 Custom Glove Box – with a twist!
9 juin 2026
Custom Enclosures: Flexible, Mobile & Secure!
2 juin 2026
An unforgettable day on the water! ⛵
21 mai 2026
🛡️ Minimising FME risks – in record time!
6 mai 2026
From high-tech research to logistics...
28 avril 2026
12 Years of KBH Innovation AG
9 avril 2026
𝗙𝘂𝗹𝗹 𝗵𝗮𝗹𝗹? 𝗪𝗲 𝗯𝘂𝗶𝗹𝗱 𝘁𝗵𝗲 𝘀𝗽𝗮𝗰𝗲 𝘆𝗼𝘂 𝗻𝗲𝗲𝗱.
7 avril 2026
Lack of space at the plant? We create room for (special) projects. 🏗️
26 mars 2026
So that transport doesn't turn into a war of nerves. 🚛💨
25 mars 2026
Smart Storage: Goodbye Corrosion 👋
Plus de posts